As the application of ppgi Coated Coils becomes more and more common, very good results have been obtained. For better use, it must be operated strictly in accordance with the regulations to achieve good results. Let's understand the requirements for the use of color-coated plates. Which ones.

During the use of the ppgi Coated Coils, the leveling layer must first have sufficient bearing capacity, and there should be no cracks, hollowing, sanding, etc. The base cement strength must be greater than 10Mpa. The foundation ground should be clean, free of grease, paint, glue, hard cement, etc. The foundation line shall be constructed after the installation of the floor, and attention shall be paid to protect the ground of the installed pvc coil during construction. Where the coiled floor is connected to other grounds, other grounds must be installed and connected to the edges first to ensure a smooth connection. 

ppgi Coated Coils

Before paving the floor, the concrete floor must be leveled 15-20 days in advance with C10 mortar, and the leveling height is 5mm lower than the design height of the ground. The leveling surface is smooth, and the leveling requirement of the color-coated board for the foundation ground leveling is less than 2 mm within every 2 meters. The concrete and screed layer must be fully dried before installing the coiled floor. Generally, it takes 15-20 days before the construction can be carried out. The moisture content of the whole ground should not exceed 5%.

The above is about the requirements for the use of ppgi Coated Coils. Good product quality and correct use methods can achieve good results and avoid unnecessary trouble. If you have any questions you don't understand, you can contact us at any time.